Step 1
Find the NEM schedule on your bill
Open your most recent electric bill and look for the rate schedule. It is usually printed near the top of page 2 or in a \u201cService Details\u201d / \u201cRate Schedule\u201d box.
Look for one of these labels: NEM2 (NEM 2.0 \u2014 the good one), NEM (legacy NEM 1.0), or NBT (Net Billing Tariff \u2014 that is NEM 3.0).
Step 2
NEM2 vs NBT \u2014 what each means
| Label on bill | What it is | Export value |
|---|---|---|
| NEM2 | NEM 2.0 (grandfathered) | ~$0.30\u2013$0.39/kWh |
| NBT | NEM 3.0 (current default) | ~$0.05\u2013$0.08/kWh |
Step 3
Check the true-up period
NEM 2.0 accounts settle on an annual true-up (once a year, the utility reconciles your net exports/imports for the prior 12 months). NEM 3.0 (NBT) accounts settle monthly. If your bill references an annual true-up cycle, that is a strong signal you are on NEM 2.0.
Step 4
Confirm the PTO date
The PTO (Permission to Operate) date is when the utility turned the system on \u2014 it starts the 20-year grandfathering clock. PTO before April 15, 2026 = NEM 2.0. The PTO date is usually in your original interconnection paperwork and may appear in your utility portal under the solar/net-metering section.
Plug the PTO date into our NEM 2.0 grandfathering calculator to see exactly when grandfathering expires.
By utility
Where to look for SCE, PG&E, and SDG&E
- SCE (Southern California Edison): sign in at sce.com, open your account, and look under Service Details \u2192 Rate Schedule. NEM 2.0 shows as \u201cNEM2\u201d.
- PG&E: sign in at pge.com, go to Energy Usage \u2192 Solar Generation, and check the NEM agreement type.
- SDG&E: sign in at sdge.com and look under My Energy \u2192 Net Energy Metering.
If you cannot find the PTO date or NEM schedule, request a complimentary assessment and a licensed contractor will pull it for you.